b. The feeder after installation should be left with a clearance of 20mm, the horizontal direction should be horizontal, and the suspension device should be flexible.
c. Before the air test, all the bolts should be firmed once, especially the anchor bolts with vibration and electromagnetic. After continuous operation for 3-5 hours, they should be tightened again.
d. During the test run, the two vibration motors must rotate.
e. During the feeding process, the amplitude, current and noise stability should be checked frequently, and if abnormal, it should be stopped in time.
f. Lubricating oil is added to the electromagnetic bearings every 2 months, and lubricating oil should be added once a month in high temperature seasons.
- Rubber Lined Vertical Flap Check Valve
- Rubber lined Swing Type Check Valve
- Pneumatic Split Type Ceramic Lined Knife Gate Valve
- Pneumatic O Type Ceramic Lined Ball Valve FRQ641TC
- Corrosion-Resistant Fluorine Lined Lift Vertical Check Valve
- PFA Lined Vertical Lift Check Valve for Chemical industry
- Double Girder Clean Room Overhead Crane
- Cyprus-canister liquid nitrogen KGSQ-liquid nitrogen dewar for cell storage
- SWF/Konecranes/Verlinde Travel motor MF06LA200-132F95001E-IP55
- SWF/Konecranes Travel motor MF06LB200-137F84008E-IP55
- YV100II MULTI CAMERA + LED
- YV100II folder side cylinder KG7-M9236-00X